Monday, December 13, 2010

Electricians are here we know why the parking lights are off and are working on a solution. At&t is out to lower phone lines. Mason was here to check mock wall.

Thursday, December 9, 2010

Terra Tech on site testing our wedge anchors.
Roofing in progress. Structural and building wrap inspections set this morning.

Tuesday, December 7, 2010

We've passed our city inspections for plumbing and electrical rough. Framers are here finishing the demo in the classrooms.

Friday, December 3, 2010

Tuesday, November 30, 2010

Electricians are here to finish the rough in on the new clasrooms. RTP pulled the forms on the stairs. Rain is moving in preventing work on the outside.

Monday, November 29, 2010

Electricians are here fir the rough in. Plumbers soon behind to set stacks and relocate the the hose bib. All rental equipment has been returned.



Framing up. Tarps on until roofers arrive mid-week. Walls sheeted and tyvec covering on and windows re-set. Stairs poured.

Thursday, November 18, 2010

LULL ON SITE. FRAMERS PULLING DOWN GUTTERS. WAITING FOR TRUSSES TO ROLL OFF.

Wednesday, November 17, 2010



On Monday we had to remove the Cure blankets temporarily to smooth out the wall to Spec and pull a line to square the new stem wall with the existing.

Wed
Sunny
66°F | 37°F
Thu
Partly Cloudy
64°F | 38°F
Fri
Sunny
64°F | 39°F
Sat
Sunny
68°F | 40°F


Blankets are holding despite wind and we are maintaining them wet. The rain is a big help.
Mock Wall up and ready in 3 days for inspection after mortar cures.

Monday, November 15, 2010

The first 12" fromthe top of the stem wall have been smoothed out and the brick ledge all arond has been cut to a straight line. Curing blanket are holding.

Tuesday, November 2, 2010

Forms were pulled 24 hrs after pour and the outside temp was a cool 41 deg F. We will be back-filling tomorrow and try to stay ahead of the rain.


The Weather looks bad for a couple of days.
Wed
Scattered Showers
59°F | 51°F
Thu
Showers
61°F | 40°F
Fri
Partly Cloudy
60°F | 36°F







Tuesday, October 26, 2010
















The re bar is in. Unfortunately, we had to cancel the inspection scheduled today due to rain and after a late start we completed the forms, blocking and called in for another inspection. The site was cleaned but a heavy down pour has made work very muddy. As the weather improves, we will make sure that all the mes from the weather is cleaned properly.

The weather will be a deciding factor in this weeks concrete pour
78°F
Current: Mostly Cloudy
Wind: SW at 16 mph
Humidity: 73%
Tue
Scattered Thunderstorms
83°F | 71°F
Wed
Scattered Thunderstorms
87°F | 66°F
Thu
Partly Cloudy
80°F | 47°F
Fri
Sunny
63°F | 39°F


Thursday, October 21, 2010

Thursday Oct 21



Last of the curb is demo'ed.
The storefront has been removed.


Weather looks good for today and tomorrow.

Weather for Cary, NC

- Add to iGoogle
74°F | °C
Current: Sunny
Wind: W at 17 mph
Humidity: 34%
Thu
Partly Cloudy
77°F | 46°F
Fri
Sunny
70°F | 42°F
Sat
Partly Cloudy
76°F | 50°F

Wednesday, October 20, 2010


Forms for stem-walls set



Demo on Southeast Corner
Brick arrives

Weather for Cary, NC 27513

- Add to iGoogle
58°F | °C
Current: Mostly Cloudy
Wind: N at 4 mph
Humidity: 90%
Wed
Partly Cloudy
64°F | 49°F
Thu
Sunny
79°F | 46°F
Fri
Sunny
70°F | 43°F
Sat
Partly Cloudy
76°F | 53°F
Weather could have been better. We were rained out today. We pulled forms on the sidewalks formed yesterday and started demo on the post footers.